IVS Analysis Report for R11086 (20230116-r11086) This report is the official IVS analysis report that corresponds to the database maintained by the IVS Data Centers for this session. (Analyzed by Sergei Bolotin, NVI, Inc. / NASA Goddard Space Flight Center. Spoolfile source: interactive solve/nuSolve analysis.) ***WARNING: Some source(s) are in the spoolfile or the database but not in the schedule: OJ287 NRAO150 3C274 NGC6251 1014+615 0718+793*** Problems: HOBART12(Hb) No lsb channels present. Missed few scans KATH12M (Ke) No lsb channels present. Antenna errors (18:44-19:30) (06:52-07:37). NYALES20(Ny) Did not observe. SEJONG (Kv) After applying manual phase cals there are still two samll clock break effects in the residuals of the station. Interval between the breaks is small to estimate clock break offsets, some of observations were deselected. YARRA12M(Yg) Antenna stuck (17:00-17:03). Parameterization comments: A clock break was added to KATH12M. Other comments: This is a second submission with manual phase cals applied for SEJONG and fixed some subambiguities in S-band. ----------------------------------------- Session statistics Observations: 7909 scheduled 6526 correlated (in database) 5379 recoverable (usable) 4820 used Session fit: 41.923 ps ----------------------------------------- Station Performance Number of Observations Scheduled Recoverable* Used % of scheduled obs used HART15M 1552 1192 1149 74.0% HOBART12 1518 1144 767 50.5% ISHIOKA 1926 1510 1417 73.6% KATH12M 1697 1060 670 39.5% MATERA 1713 1214 1188 69.4% NYALE13S 1085 750 740 68.2% NYALES20 1357 MISSED MISSED 0.0% SEJONG 1510 1112 1018 67.4% WETTZELL 1778 1415 1385 77.9% YARRA12M 1682 1361 1306 77.6% --------------- --------- ----------- --------- ------ Station Total** 7909 5379 4820 60.9% * Recoverable: can be included in the solution. ** Total includes distinct observations only. MISSED: Station was scheduled, but it did not observe. NOT CORR: Station was scheduled but not correlated. NOT USED: Usable data was generated for this station, but the analyst rejected it all. ----------------------------------------- Source Performance Number of Observations Scheduled Correlated* Used % of scheduled obs used 2351-154 24 24 11 45.8% 2002-375 5 5 0 0.0% 0422-380 12 12 5 41.7% 2037+216 68 52 20 29.4% 1610-771 56 56 28 50.0% 0342+147 50 39 32 64.0% 0930-080 16 16 13 81.2% 1647-296 7 7 3 42.9% 0104-408 5 5 2 40.0% 0119+115 143 91 82 57.3% 0133+476 244 166 153 62.7% 0229+131 279 184 133 47.7% 0458-020 333 309 194 58.3% 0530-727 13 13 5 38.5% 0537-441 121 119 44 36.4% 0602+673 33 18 18 54.5% 1034-293 6 6 2 33.3% 1057-797 168 168 102 60.7% 1128+385 430 305 265 61.6% 1144-379 189 189 93 49.2% 1334-127 55 55 23 41.8% 1418+546 26 14 13 50.0% 1451-375 36 36 17 47.2% 1741-038 240 232 225 93.8% 1749+096 358 285 254 70.9% 2255-282 73 71 46 63.0% 0237-027 4 4 4 100.0% 0346-279 70 70 33 47.1% 0648-165 294 294 172 58.5% 0800+618 27 25 23 85.2% 0920+390 15 13 10 66.7% 1149-084 256 256 175 68.4% 1244-255 12 12 9 75.0% 1324+224 48 33 32 66.7% 1636+473 35 29 22 62.9% 1639-062 244 244 193 79.1% 1846+322 78 56 55 70.5% 2000+472 164 103 84 51.2% 2227-088 250 250 176 70.4% 0019+058 8 8 7 87.5% 0340+362 14 12 8 57.1% 0446+112 4 4 3 75.0% 0529+483 26 16 15 57.7% 0641+392 13 13 10 76.9% 0738+491 29 17 16 55.2% 1040+244 65 50 45 69.2% 1306+360 49 35 31 63.3% 1546+027 406 350 304 74.9% 1617+229 24 17 13 54.2% 2059+034 16 16 11 68.8% 2144+092 6 4 4 66.7% 2309+454 13 7 7 53.8% 2319+317 33 25 24 72.7% 0537-286 259 259 119 45.9% 0646-306 31 31 15 48.4% 0920-397 17 17 5 29.4% 1432+200 3 3 3 100.0% 1759-396 6 6 0 0.0% 0016+731 299 191 171 57.2% 0308-611 97 97 69 71.1% 0544+273 18 18 13 72.2% 1806+456 60 44 35 58.3% 0017+200 14 12 11 78.6% 0202+319 340 233 169 49.7% 0403-132 8 8 6 75.0% 0736+017 110 89 71 64.5% 0834-201 10 10 3 30.0% 1243-072 18 18 15 83.3% 1538+149 6 6 5 83.3% 1751+288 494 355 317 64.2% 1936-155 62 62 28 45.2% ------------ --------- ---------- ------ ------ Source Total 7045 5899 4324 61.4% * Correlated: included in database ----------------------------------------- Baseline Performance Number of Observations Scheduled Recoverable* Used % of scheduled obs used HART15M-HOBART12 131 99 93 71.0% HART15M-ISHIOKA 134 114 106 79.1% HART15M-KATH12M 128 55 55 43.0% HART15M-MATERA 342 271 262 76.6% HART15M-NYALE13S 100 90 90 90.0% HART15M-NYALES20 128 MISSED MISSED 0.0% HART15M-SEJONG 94 88 77 81.9% HART15M-WETTZELL 312 299 295 94.6% HART15M-YARRA12M 183 176 171 93.4% HOBART12-ISHIOKA 242 165 161 66.5% HOBART12-KATH12M 436 410 60 13.8% HOBART12-MATERA 38 10 10 26.3% HOBART12-NYALE13S 18 6 4 22.2% HOBART12-NYALES20 29 MISSED MISSED 0.0% HOBART12-SEJONG 229 117 110 48.0% HOBART12-WETTZELL 31 21 19 61.3% HOBART12-YARRA12M 364 316 310 85.2% ISHIOKA-KATH12M 271 184 156 57.6% ISHIOKA-MATERA 143 128 127 88.8% ISHIOKA-NYALE13S 139 138 138 99.3% ISHIOKA-NYALES20 194 MISSED MISSED 0.0% ISHIOKA-SEJONG 326 322 283 86.8% ISHIOKA-WETTZELL 227 217 214 94.3% ISHIOKA-YARRA12M 250 242 232 92.8% KATH12M-MATERA 63 25 25 39.7% KATH12M-NYALE13S 30 16 16 53.3% KATH12M-NYALES20 52 MISSED MISSED 0.0% KATH12M-SEJONG 259 108 108 41.7% KATH12M-WETTZELL 59 44 40 67.8% KATH12M-YARRA12M 399 218 210 52.6% MATERA-NYALE13S 206 189 189 91.7% MATERA-NYALES20 269 MISSED MISSED 0.0% MATERA-SEJONG 90 64 59 65.6% MATERA-WETTZELL 481 457 449 93.3% MATERA-YARRA12M 81 70 67 82.7% NYALE13S-NYALES20 268 MISSED MISSED 0.0% NYALE13S-SEJONG 74 69 65 87.8% NYALE13S-WETTZELL 224 223 220 98.2% NYALE13S-YARRA12M 26 19 18 69.2% NYALES20-SEJONG 87 MISSED MISSED 0.0% NYALES20-WETTZELL 280 MISSED MISSED 0.0% NYALES20-YARRA12M 50 MISSED MISSED 0.0% SEJONG-WETTZELL 93 89 83 89.2% SEJONG-YARRA12M 258 255 233 90.3% WETTZELL-YARRA12M 71 65 65 91.5% ----------------- --------- ----------- ---------- ------ Baseline Total 7909 5379 4820 60.9% * Recoverable: can be included in the solution. MISSED: Baseline was scheduled, but at least one of the sites did not observe. NOT CORR: Baseline was scheduled but not correlated. NO DATA: The baseline's stations were both correlated, but they did not observe together. DESELECTED: Usable data was generated for the baseline, but the analyst rejected it.