Analysis Report for AUST42 ($14AUG17XA) (Analyzed by David Gordon, NASA Goddard Space Flight Center. Spoolfile source: interactive solve/nuSolve analysis.) Problems: Hobart12 has 6 small clock breaks. Five breaks are set: 00:58 (-.70 nsec), 09:31 (-.65 nsec), 14:37 (-1.55 nsec), 17:29 (+3.60 nsec), and 21:50 (-.67 nsec). However, a break at ~15:08 cannot be set because it is too close to 14:37 and causes Solve to abort. Katherine has a small clock break at ~06:41 (-.72 ns) Parameterization comments: The solution and editing was run with RA/Dec turned on for 11 ICRF2 special handling sources. Adjustments are small. Other comments: None. ----------------------------------------- Session Statistics Observations: 4065 scheduled 4065 correlated (in database) 3991 recoverable (usable) 3856 used Session fit: 35.601 ps ----------------------------------------- Station Performance Number of Observations Scheduled Recoverable* Used % of scheduled obs used HOBART12 2047 1989 1911 93.4% KATH12M 2041 2025 1970 96.5% WARK12M 1995 1944 1895 95.0% YARRA12M 2047 2024 1936 94.6% --------------- --------- ----------- --------- ------ Station Total** 4065 3991 3856 94.9% * Recoverable: can be included in the solution. ** Total includes distinct observations only. MISSED: Station was scheduled, but it did not observe. NOT CORR: Station was scheduled but not correlated. NOT USED: Usable data was generated for this station, but the analyst rejected it all. ----------------------------------------- Source Performance Number of Observations Scheduled Correlated* Used % of scheduled obs used 0420-014 87 87 85 97.7% OJ287 56 56 53 94.6% 1144-379 108 108 105 97.2% 0537-441 129 129 118 91.5% 0637-752 166 166 157 94.6% 0657+172 13 13 10 76.9% 0220-349 16 16 14 87.5% 1055+018 13 13 13 100.0% 0308-611 50 50 44 88.0% 0754+100 12 12 12 100.0% 4C39.25 29 29 27 93.1% NRAO140 9 9 8 88.9% 1424-418 127 127 124 97.6% NRAO190 19 19 19 100.0% 0826-373 58 58 58 100.0% 1104-445 27 27 24 88.9% 1128+385 22 22 22 100.0% 2232-488 111 111 111 100.0% 0426-380 90 90 85 94.4% 0332-403 111 111 104 93.7% 0727-115 86 86 80 93.0% 0454-234 92 92 87 94.6% 0607-157 85 85 76 89.4% 0748+126 51 51 51 100.0% 0834-201 82 82 80 97.6% 0454-463 97 97 89 91.8% 0648-165 69 69 61 88.4% 0738+313 19 19 18 94.7% 1255-316 50 50 49 98.0% 1124-186 60 60 60 100.0% 1038+064 38 38 37 97.4% 1237-101 15 15 15 100.0% 1622-297 13 13 11 84.6% 2355-534 56 56 55 98.2% 1334-127 90 90 90 100.0% 0723-008 19 19 13 68.4% 1156+295 18 18 18 100.0% 0516-621 26 26 26 100.0% 0552+398 22 22 21 95.5% 1510-089 80 80 79 98.8% CTA26 79 79 65 82.3% 1657-261 62 62 56 90.3% 1519-273 90 90 90 100.0% 3C274 9 9 9 100.0% 2052-474 29 29 29 100.0% 1144+402 12 12 12 100.0% 1548+056 21 21 19 90.5% 1741-038 80 80 79 98.8% 1921-293 114 114 108 94.7% 0919-260 30 30 30 100.0% 1633+38 31 31 31 100.0% 1656+053 14 14 13 92.9% 1308+326 4 4 4 100.0% 2142-758 18 18 15 83.3% 1611+343 15 15 11 73.3% 1958-179 86 86 83 96.5% 1749+096 70 70 68 97.1% 1954-388 103 103 103 100.0% 1920-211 45 45 43 95.6% 1908-201 25 25 22 88.0% 2255-282 80 80 80 100.0% 1751+288 31 31 30 96.8% 1034-293 4 4 4 100.0% 2145+067 73 73 71 97.3% 1057-797 19 19 18 94.7% 2149-306 12 12 12 100.0% 2136+141 21 21 14 66.7% 2131-021 55 55 53 96.4% 2355-106 31 31 31 100.0% VR422201 5 5 5 100.0% 3C446 55 55 54 98.2% 2227-088 39 39 37 94.9% 2243-123 12 12 12 100.0% CTA102 67 67 64 95.5% 2209+236 30 30 26 86.7% 0106+013 70 70 64 91.4% 0003-066 25 25 20 80.0% 2234+282 18 18 15 83.3% 0119+115 61 61 56 91.8% 0229+131 7 7 7 100.0% 0202+319 32 32 28 87.5% 2121+053 6 6 6 100.0% 0405-385 6 6 6 100.0% 0400+258 33 33 31 93.9% 0202-172 15 15 13 86.7% ------------ --------- ---------- ------ ------ Source Total 4065 4065 3856 94.9% * Correlated: included in database ----------------------------------------- Baseline Performance Number of Observations Scheduled Recoverable* Used % of scheduled obs used HOBART12-KATH12M 668 657 638 95.5% HOBART12-WARK12M 692 657 641 92.6% HOBART12-YARRA12M 687 675 632 92.0% KATH12M-WARK12M 658 653 641 97.4% KATH12M-YARRA12M 715 715 691 96.6% WARK12M-YARRA12M 645 634 613 95.0% ----------------- --------- ----------- ---------- ------ Baseline Total 4065 3991 3856 94.9% * Recoverable: can be included in the solution. MISSED: Baseline was scheduled, but at least one of the sites did not observe. NOT CORR: Baseline was scheduled but not correlated. NO DATA: The baseline's stations were both correlated, but they did not observe together. DESELECTED: Usable data was generated for the baseline, but the analyst rejected it.