IVS-T2036 (International VLBI Service - Terrestical Reference Frame Observations) 2004 Dec. 07/08 doy 342/343 Geodetic Institute of the University of Bonn, Germany Correlator ========== see MASTER SCHEDULE 2004 Purpose ======= General the purpose of the IVS-T2 sessions is to monitor the TRF via monthly sessions. Since April 2004 the purpose of the remaining IVS-T2 sessions has been changed by the IVS OPC (Observing Program Committee). The new plan uses larger networks for each T2 session, say 16 to 20 stations, but have fewer T2 sessions during the year. The larger network should provide a stronger solution and better TRF results, even if there are fewer sessions each year. The TRF determine from single session solutions or from a global solution is very important IVS product because this is an essential part for creating the ITRF by corresponding IERS Product Center. A particular strength of VLBI is its contribution to the scale of the ITRF. Usually the TRF is computed from the 24h sessions that are dedicated to observing the EOP. Network ======= The standard configuration of the monthly observed IVS-T2 experiments consists of sixteen and more stations. All stations differ in some extent between all available IVS geodetic network stations from experiment to experiment. Schedule ======== This schedule was generated by SKED ((NRV/JMG 2004May05) using the EUR-SX band and the EURSX-C-2 frequency setup, depending on which station are available for this observation. Variable scan lengths with a minimum 40 sec. and the most recent source flux models are included. SNR goals are 20 at X-band and S-band depent on different baselines and stations. The predicted SNRs used include a 30 ps noise contribution added in quadrature, which is a typical magnitude for the reweight constants applied in SOLVE solutions. Some important optimization features enabled for this experiment : - the covariance analysis during schedule generation considers the previous 1 hours of observations, - minor SKED optimization parameters . maximum number of observations, . minimum time, were optimized over the best ( in a covariance sense ) 70% of the possible observations, this produces a somewhat more even sky distribution, - observations were weighted by their expected SNRs, - 30 ps noise contribution added, - mimimum time between observations of the same radio source was set to 20 min - using 63 source for improving the sky covorage (and some new astrometric sources / see $ASTROMETRIC ) Procedures ========== NO PREPASS TIME: There is no time allowed in the schedule for prepassing tapes. Therefore all tapes needed for this experiment must be pre-checked before the start of this experiment. =========================================================== Parameter values for experiment T2036 Experiment description: IVS-T2.036 Scheduler: BONN/Mueskens Correlator: BONN Nominal start: 2004-342-17:30:00 Nominal end: 2004-343-17:30:01 Current yyyyddd: 2004342 (2004.94) ( 13347 MJD, TUES 7DEC.) Greenwich sidereal time: 22:37:17.00 (17:30: 0 UT) Sun's RA and DEC: 16h 59.0m -22d 41.9 =========================================================== There are no observations for Kokee and Wettzell from 18:00 U.T. to 20:00 U.T. Kokee and Wettzell will participate in the intensive session during this two hour period. =========================================================== First observations Observation listing from file t2036.skd for experiment T2036 Source Start DURATIONS name yyddd-hhmmss Ap Ft Hh Ho Kb Mh Oh Gg Sv Ur Wz 0208-512 04342-173000| 760 760 760 | 1803+784 04342-173000| 90 760 329 760 158 523 | 3C345 04342-173656| 40 40 | =========================================================== Source Start DURATIONS 1741-038 04343-164527| 424 424 | CTA26 04343-165736| 256 256 | 1308+326 04343-170317| 760 760 | 0235+164 04343-170716| 441 285 118 441 193| 2145+067 04343-171252| 212 212 40 73| 0823+033 04343-171657| 198 198 | 1606+106 04343-172023| 125 125 | End of listing. =========================================================== Average number of obs. per baseline per source (normalized by up-time) = 2.5 Min = .0 Max = 65.5 (Baseline Ap-Kb on 0003-066) RMS = 5.5 Total time: 1432 minutes ( 23.9 hours). Key: Ap=ALGOPARK Ft=FORTLEZA Hh=HARTRAO Ho=HOBART26 Kb=KASHIM34 Mh=METSAHOV Oh=OHIGGINS Gg=ORION_5M Sv=SVETLOE Ur=URUMQI Wz=WETTZELL Ap Ft Hh Ho Kb Mh Oh Gg Sv Ur Wz Avg % obs. time: 40 46 47 55 46 50 41 19 32 55 43 43 % cal. time: 2 1 1 1 2 1 0 0 2 1 2 1 % slew time: 48 20 27 24 26 23 9 2 35 18 7 22 % idle time: 9 32 23 17 24 24 48 77 29 23 47 32 total # scans: 179 112 134 134 195 153 64 65 226 169 184 146 # scans/hour : 7.5 4.7 5.6 5.6 8.2 6.4 2.7 2.7 9.5 7.1 7.7 6.2 Avg scan (sec): 193 353 303 358 206 283 554 252 122 280 203 282 Total GBytes: 273 311 320 377 316 341 279 129 218 372 294 294 Total GB(M5): 277 316 325 383 321 346 283 131 222 378 299 299 # of tapes : .6 2.8 .7 .9 2.7 .8 .7 .3 .5 .8 .7 tape change times (hhmm): 0000 0048 0000 0000 0146 0000 0000 0000 0000 0000 0000 0000 0938 0000 0000 1157 0000 0000 0000 0000 0000 0000 Total number of tapes: 11.4 Total GBytes (M5) recorded: 3288.2 # OF OBSERVATIONS BY BASELINE | Ap Ft Hh Ho Kb Mh Oh Gg Sv Ur Wz StnTotal ---------------------------------------------------------- Ap|179 50 16 1 32 36 12 62 60 29 48 346 Ft| 112 62 1 5 20 12 4 29 16 32 231 Hh| 134 30 17 29 13 0 47 34 58 306 Ho| 134 71 1 39 1 6 16 3 169 Kb| 195 50 1 0 91 103 53 423 Mh| 153 0 0 134 84 109 463 Oh| 64 0 1 0 0 78 Gg| 65 0 0 0 67 Sv| 226 118 149 635 Ur| 169 85 485 Wz| 184 537 Number of 2-station scans: 326 Number of 3-station scans: 122 Number of 4-station scans: 51 Number of 5-station scans: 47 Number of 6-station scans: 24 Number of 7-station scans: 2 Number of 8-station scans: 0 Number of 9-station scans: 0 Number of 10-station scans: 0 Number of 11-station scans: 0 Total # of scans, observations: 572 1870 =========================================================== Recording mode Name Code EUR-SX SX Recording mode setup for: ALGOPARK HARTRAO HOBART26 METSAHOV OHIGGINS GGAO7108 SVETLOE URUMQI WETTZELL Mode Tot.Rate Tot.BandW #chan #bits Barrel C 56.000 Mbits 28.000 MHz 14 1 NONE Chan.BW #Subpasses Tracks(*fan) Tot.tracks Speed 2.00 MHz 2 14(*0) 28 80.00 X-band spanned bw= 360.0 MHz rms spanned bw= 140.2 MHz S-band spanned bw= 85.0 MHz rms spanned bw= 33.0 MHz Effective number of channels recorded per sub-pass X S Total 8.000 6.000 14.000 Recording mode setup for: FORTLEZA KASHIM34 Mode Tot.Rate Tot.BandW #chan #bits Barrel C 56.000 Mbits 28.000 MHz 14 1 NONE Chan.BW #Subpasses Tracks(*fan) Tot.tracks Speed 2.00 MHz 2 14(*0) 28 135.00 X-band spanned bw= 360.0 MHz rms spanned bw= 140.2 MHz S-band spanned bw= 85.0 MHz rms spanned bw= 33.0 MHz Effective number of channels recorded per sub-pass X S Total 8.000 6.000 14.000 =========================================================== Monitoring Sources Source Min Max Actual Num #Scans 0405-385 3.00 100.00 .80 15 15 1034-293 3.00 100.00 .75 14 14 Total 1.55 29 29 =========================================================== Minor Options Option Norm Wt Aux_Parm Astro Abs 5.00 BegScan Rel 1.00 EndScan Rel 1.00 NumObs Rel 5.00 StatIdle Abs 1.00 StatWt Abs 3.00 FFFFF FTTFF F =========================================================== Major Options SkyCov Yes Min_Between 20 Best% 60.0 Last_Hrs 24.00 Add_ps 30.00 Obs_Wts SNRwt =========================================================== Tape types ID Station Tape length Density Passes Ap ALGOPARK 17400feet (Thin ) 56250 (HIGH ) 12 Ft FORTLEZA 8700feet (Thick ) 33333 (Low ) 12 Hh HARTRAO 17400feet (Thin ) 56250 (HIGH ) 12 Ho HOBART26 17400feet (Thin ) 56250 (HIGH ) 12 Kb KASHIM34 8700feet (Thick ) 33333 (Low ) 12 Mh METSAHOV 17400feet (Thin ) 56250 (HIGH ) 12 Oh OHIGGINS 17400feet (Thin ) 56250 (HIGH ) 12 Gg GGAO7108 17400feet (Thin ) 56250 (HIGH ) 12 Sv SVETLOE 17400feet (Thin ) 56250 (HIGH ) 12 Ur URUMQI 17400feet (Thin ) 56250 (HIGH ) 12 Wz WETTZELL 17400feet (Thin ) 56250 (HIGH ) 12 =========================================================== SNR Targets Minimum SNR by baseline for multi-baseline scans X-band (margin 3) S-band (margin 3) Ap Ft Hh Ho Kb Mh Oh Gg Sv Ur Ap Ft Hh Ho Kb Mh Oh Gg Sv Ur Ft 25 Ft 25 Hh 25 25 Hh 25 25 Ho 25 25 25 Ho 25 25 25 Kb 25 25 25 25 Kb 25 25 25 25 Mh 25 25 25 25 25 Mh 25 25 25 25 25 Oh 20 20 20 20 20 20 Oh 20 20 20 20 20 20 Gg 20 20 20 20 20 20 20 Gg 20 20 20 20 20 20 20 Sv 25 25 25 25 25 25 20 20 Sv 25 25 25 25 25 25 20 20 Ur 25 25 25 25 25 25 20 20 25 Ur 25 25 25 25 25 25 20 20 25 Wz 25 25 25 25 25 25 25 25 25 25 Wz 25 25 25 25 25 25 25 25 25 25